Completed internal adversarial soak campaigns, product-level test totals and explicit limits. This evidence supports audit scoping and does not assert external certification.
Status as of 6 August 2026. Software portfolio built and internally test-green. Validation class: simulation-validated and ground-demonstrated. Code-complete and internally simulation-validated as a verifiable mission recorder and distributed mission black-box architecture. G0 (scope/IP/evidence freeze) and G1 (V2 codebase complete) are COMPLETE. G2–G7 remain PENDING external parties (independent audit · radiation/target-hardware · HIL telemetry · LEO shadow · lunar bounded pilot · mission-owner acceptance). Evidence: C0–C9 GO · 410/410 integrated tests · Release Candidate frozen. Ready for independent security audit, target-hardware validation and partner telemetry integration.
Not claimed: flight qualification · operational space deployment · certified PQ hardware root · agency acceptance · flight-ready · flight-proven · flight-qualified · radiation-tested · independently audited · certified. Green never means flight-ready, flight-proven, radiation-tested, audited or certified.
The Post-Quantum (PQ) leg currently utilizes size-conformant ground stand-ins (pending formal NIST FIPS 204 ML-DSA / FIPS 205 SLH-DSA hardware security module certification). Not flight-qualified. Not independently audited by external third parties.
Internal controlled soak campaigns (not operational space service). Example: 30-day internal soak · reported 0 failures under test conditions.
Status legend: Built · Simulation-validated · Ground-demonstrated · Hardware-blocked · Audit not completed
Sustained operation, fault recovery and signing continuity
All six soak evidence documents were withdrawn on 30 August 2026, superseded pending a coordinated corrected re-issue. The figures printed on the cards below are shown as they were published and are not current evidence: in each run, real measurements were gated by verdict logic that could not reach a failing outcome. Every original document is preserved unchanged. Read the withdrawal notice, document by document →
Every card names the measured result, the completion date available in the source record and the evidence file retained for review.
Three signature legs operated under adversarial injection, partial-signature refusal, partition detection and in-test key rotation with complete archival continuity.
Hybrid Moat: Built · DoD sign-off pending. The Post-Quantum (PQ) leg currently utilizes size-conformant ground stand-ins (pending formal NIST FIPS 204 ML-DSA / FIPS 205 SLH-DSA hardware security module certification). Not flight-qualified. Not independently audited by external third parties.
Evidence scope
What this evidence proves — and what it does not
Proves
Internal test completion, fault recovery, receipt continuity, partition detection, signature refusal and the recorded software-build posture.
Does not prove
Flight qualification, flight readiness, external certification, customer deployment or completion of an independent external security audit.
Audit posture
Raw machine output, closing snapshots and evidence documents are retained for audit scoping. Independent external security audit: not completed.
Internal security freeze (RC3) completed 6 August 2026 for the COSRYX mission-evidence stack. Independent external security audit has not been completed.