Investors · COSRYX V2 one-pager · Status as of 21 October 2026

Two gates closed. Six to go.

COSRYX builds verifiable mission intelligence for space: every command, decision and health record a spacecraft or rover produces becomes evidence a third party can check later.

COSRYX V2 is a verifiable mission recorder, a distributed black box. The code gates are complete. Everything after them needs outside parties, and this page says exactly which is which.

Code gatesG0 + G1 complete
Integrated tests (G1)410 / 410
Manifest entries (G0)5,447 / 5,447
External auditAudit not completed
SCROLL
01 What it is

A black box that keeps working when the link does not.

COSRYX V2 preserves the last verified state, decision history, command lineage and failure evidence of spacecraft, rovers and satellites, even when communication is disrupted.

Every entry is a DCS R-Series receipt: signed with Ed25519 and ML-DSA-65, chained to the one before it, and checkable offline by anyone with the public keys. A missing, reordered or edited record shows up as a broken link.

The software is built and internally tested. Its validation class today is simulation-validated and ground-demonstrated. It is not flight-qualified, not externally audited, and no launch contract is signed.

We do not replace mission security; we add mission evidence.

02 Status as of 21 October 2026

Four numbers, four populations.

410/410integrated tests for COSRYX V2; C0 to C9 all GOG1 complete
5,447of 5,447 manifest entries reproduced exactlyG0 complete
677/677RC3 internal security-gate checksFreeze complete · internal
692product tests across twelve products and the Hybrid MoatInternal

These are separate populations. They are never added together, and none of them is an external audit or a flight result.

03 The gate ladder

Internal gates done. External gates pending.

G0Scope, IP and evidence freezeComplete
G1V2 codebase complete · C0–C9 GOComplete
G2Independent security and cryptographic auditAudit not completed
G3Radiation and target-hardware validation · nextPlanning · next
G4Hardware-in-the-loop telemetry pilotPlanning
G5LEO shadow on a hosted or owned payloadPlanning
G6Lunar bounded autonomyFuture direction
G7Mars and mission-critical acceptanceFuture direction

G0 and G1 are internal and controlled by DCS Labs. G2 to G7 each need an outside party: an auditor, a radiation facility, telemetry partners, a spacecraft, and eventually a mission owner.

04 Why the order matters

Each gate earns the right to attempt the next.

The ladder runs from what we can prove alone to what only a mission can prove.

An external audit checks the cryptography and the trust layer. Radiation testing checks whether records survive the environment. Hardware-in-the-loop and LEO shadow check real telemetry. Lunar and Mars acceptance are for mission owners to grant, not for us to declare.

We publish the ladder so anyone can see which rung we are on. Today: G1 done, G3 next, G2 initiated but not completed.

05 The product portfolio

Twelve products on one receipt format.

FOUNDATION · 249

PQ-Agility · DSRP · AI Sovereignty Oracle

TestedSimulation-validated
S1–S7 · 258

Seven mission applications

BuiltSimulation-validated
N13 · S8 · S9 · 96

Provenance and accountability

BuiltGround-demonstrated
HYBRID MOAT · 89

HYBRID-01 · 02 · 03

BuiltDefinition-of-done sign-off pending

Numbers on each card are product tests for that group: 249 + 258 + 96 + 89 = 692 product tests. Every product →

06 Public roadmap

Radiation testing next. Then our own CubeSat.

Done · internal

G0 + G1 · RC3 freeze · 12 products built

Code gates complete and internal security freeze complete. Internal results, not an external audit.

Then

COSRYX's own 6U CubeSat

Target about 18 months after radiation testing. Planning stage, subject to funding and licensing. No launch contract is signed.

If funding allows

A second, larger CubeSat

So that DCS operates its own satellite capacity. Funding-dependent.

Later

G4 to G7

Hardware-in-the-loop, LEO shadow, then lunar and Mars acceptance, each with outside parties.

Future direction

An Earth–Moon–Mars evidence network

One verifiable communication and evidence network across the three, an interplanetary relay.

The full public roadmap
07 What is claimed, and what is not

Green never means flight.

CLAIMED

Yes Internally complete

  • G0 and G1 complete: C0 to C9 GO, 410 of 410 integrated tests, 5,447 of 5,447 manifest entries.
  • RC3 internal security freeze: 677 of 677 internal security-gate checks.
  • Twelve products built: simulation-validated, ground-demonstrated or tested, as labelled.
NOT CLAIMED

No Anything that needs the outside world

  • No flight qualification, flight heritage or operation in orbit.
  • Not radiation-tested; not independently audited; no certification.
  • No hardware key custody for the post-quantum leg yet (key custody in this stage is software; hardware custody certification is pending) and no agency acceptance.
  • No launch contract, no fixed launch date and no fixed mission cost.
08 Required statements

Three lines that travel with every claim.

Internal security freeze (RC3) complete · External audit not completed · No flight qualification claimed.
The post-quantum (PQ) leg uses ML-DSA-65 (FIPS 204) via the R-Series engine. Key custody in this stage is software; hardware custody certification is pending. Not flight-qualified. Not independently audited.
No launch contract is signed.
Earlier internal soak records were withdrawn on 30 August 2026 because the verdict logic could not report a failure; corrected records will be re-issued as a set. Earlier versions of the investor pages quoted figures from those records; they have been removed. Read the evidence page →
09 Investor conversations

What we share, and how.

IN PUBLIC

This page

Gates, populations, the roadmap and the non-claims. No financial figures are published on this site.

ON REQUEST

A technical walk-through

How a receipt is made, chained and verified offline, and how the gate evidence was produced.

UNDER AGREEMENT

Deeper materials

Anything beyond the public record is shared only under a written agreement, and carries the same status labels.

10 Questions

Investors ask.

What would funding change first?

Radiation testing (G3) and the external audit (G2), then the 6U CubeSat about 18 months after radiation testing, subject to licensing.

Is a launch booked?

No. No launch contract is signed and no launch date is fixed. The CubeSat is at the planning stage.

Has the security been checked by anyone outside?

Not yet. RC3 is an internal freeze. An external audit inquiry has been sent; the audit is not completed.

Why are there no soak figures?

They were withdrawn on 30 August 2026 because the verdict logic could not report a failure. Corrected records will be re-issued as a set.

Who operates COSRYX?

COSRYX is a DCS Labs space research initiative, operated by DCS AI Technologies India Private Limited, Hisar, India, and DCS AI Technologies LLC, Dubai, United Arab Emirates.

11 Start a conversation

Read the evidence. Then ask us anything.

Investor and agency conversations start at research@cosryx.com.