Roadmap · Public form · Status as of 21 October 2026

Radiation testing next.

Six steps, in order. The first is done internally. The second is next. Everything after it depends on the one before, and on funding and licensing. No launch contract is signed.

Done · internalG0 + G1 · RC3 · 12 products
NextRadiation testing (G3)
Own 6U CubeSatPlanning
Launch contractNone signed
00 How to read this page

Gates, not dates.

Every step on this roadmap is a gate: it is passed when its evidence exists, not when a calendar says so. The only time estimate we publish is a target of about 18 months from radiation testing to our own CubeSat, and that target is subject to funding and licensing.

Steps that need money, licences or outside parties are labelled that way. "Planning" means we are designing it, not that it is committed. "Future direction" means it is where we are heading, not a plan with dates.

01 The public roadmap

Six steps, in order.

1 · Done (internal)

Code gates G0 + G1 · RC3 internal security freeze · 12 products built

COSRYX V2 code-complete (C0–C9 GO, 410/410 integrated tests, 5,447/5,447 manifest entries). RC3 complete with 677/677 internal security-gate checks. Twelve products built, 692 product tests. Done · internal

3 · Then

COSRYX's own 6U CubeSat

Target about 18 months after radiation testing. Planning stage; subject to funding and licensing; no launch contract is signed. Planning

4 · If funding allows

A second, larger CubeSat

So that DCS operates its own satellite capacity. Funding-dependent. Planning · funding-dependent

5 · Later

Hardware-in-the-loop, LEO shadow, lunar and Mars acceptance (G4–G7)

The remaining gates of the COSRYX V2 ladder, each needing hardware, partners or missions. Pending

6 · Future direction

The Earth–Moon–Mars verifiable network

Link Earth, the Moon and Mars into one verifiable communication and evidence network: an interplanetary relay. Future direction

02 Fly the roadmap

Scroll to pass through each gate.

Public roadmap01 / 06
01 · DONE (INTERNAL)

The ground we stand on

Two code gates, an internal security freeze and twelve built products. All internal; none of it is an external audit.

02 · NEXT

Radiation testing

The first gate that needs the physical world: real particles, real bit upsets, real hardware. Our simulations so far (18/18 in the radiation-integrity simulation) are not a substitute.

03 · THEN

Our own 6U CubeSat

A small satellite we own, as a test bench for our payload. About 18 months after radiation testing, if funding and licensing allow.

04 · IF FUNDED

A larger CubeSat

More capacity, longer tests, and satellite time that DCS controls itself.

05 · LATER

G4 to G7

Hardware-in-the-loop, a LEO shadow run, lunar bounded autonomy and Mars acceptance, with partners and missions.

06 · FUTURE DIRECTION

Earth, Moon, Mars

One evidence network across all three, where every hand-off between worlds is a receipt.

03 Step 1 · Done (internal)

What "done" covers, and what it does not.

G0 + G1COSRYX V2 code gates complete; C0–C9 all GOComplete
410integrated tests passing (G1)Internal
677RC3 internal security-gate checks passingInternal
692product tests across 12 products and the Hybrid MoatInternal

Not covered by step 1: external audit (G2), radiation testing (G3), flight qualification, or any operation in orbit. Earlier internal soak records were withdrawn on 30 August 2026 because the verdict logic could not report a failure; corrected records will be re-issued as a set. Evidence page →

04 Step 2 · Next

Radiation testing.

In space, energetic particles flip bits in memory and logic. COSRYX is designed to notice: HYBRID-01 refuses a computation whose deterministic replay diverges, and EDGE keeps scrub receipts for model integrity.

So far we have shown that in simulation. Radiation testing puts representative hardware in a real particle beam and checks that upsets are detected, quarantined and kept out of the chain.

It is the next gate. Until it is passed, nothing on this site calls COSRYX radiation-tested.

05 Step 3 · Then

Our own 6U CubeSat.

A satellite of our own lets us test our payload on our terms: power-cycle it, check it re-acquires the signal, and run controlled fault drills.

  • Target: about 18 months after radiation testing
  • Stage: planning
  • Depends on: funding and licensing
  • Launch: no launch contract is signed
The CubeSat plan
06 Step 4 · If funding allows

A larger CubeSat, and capacity we own.

If funding allows, a second, larger CubeSat follows, so that DCS operates its own satellite capacity rather than renting time on someone else's.

More power and volume mean longer tests, more instruments to record, and room to host partner experiments under the same evidence rules.

Planning · funding-dependent

07 Step 5 · Later

The rest of the ladder.

G0Scope, IP and evidence freezeComplete
G1V2 codebase completeComplete
G2External auditAudit not completed
G3Radiation testingPlanning · next
G4Hardware-in-the-loopPlanning
G5LEO shadowPlanning
G6LunarFuture direction
G7MarsFuture direction
08 Step 6 · Future direction

Earth, Moon and Mars, one network.

Link the three into one verifiable communication and evidence network: an interplanetary relay in which every hand-off is a receipt and every gap is visible.

COSRYX-NEXUS already simulates the custody chain. The real network is a direction, not a dated plan. Future direction

09 What could change this

The dependencies, stated plainly.

FUNDING

Money

The CubeSats depend on it. Without it, the order holds and the timing moves.

LICENSING

Permission

Spectrum and space-activity licences are required before any satellite of ours can fly.

OUTSIDE PARTIES

Audit and test facilities

The external audit and radiation testing both need independent organisations.

PARTNERS

Missions

G4–G7 need hardware, telemetry and mission owners willing to work with us.

10 Required statements

Printed in full.

Internal security freeze (RC3) complete · External audit not completed · No flight qualification claimed.
The post-quantum (PQ) leg uses ML-DSA-65 (FIPS 204) via the R-Series engine. Key custody in this stage is software; hardware custody certification is pending. Not flight-qualified. Not independently audited.
No launch contract is signed.